Test Case

Show / Hide direct link   <MAIN> 5028PA: Win-8 : E2E WAN function verification test - PP-80487



Version 1
Created on 13/11/2012 16:33:04  by Muralidharan Seshadri
Summary
Preconditions
Status:   New
Priority:   High
BASIC INFORMATION
Section:S/W Test Require attachment:No
Team:Network Group:Test Coverage
Lessons Learned:No Phase:SIT, SVT
Locations:Inhouse: AWS and Cambridge, Inhouse: AWS, Inhouse: Cambridge, Compal, Flextronics, Quanta, Wistron Owned By:Eiji Ogata/LENOVO
Objective:E2E WWAN Test
CRITERIA
Refer procedure section
EUT QUANTITY
Test system with the supported carrier SIM
EQUIPMENT
Test system with the supported carrier SIM
Critical Attribute:[0] : WLS - Wireless

CONFIGURATION
REFERENCE PROCEDURE
STATISTIC INFO
Operating System Win10-32bit Total
Test Points
Duration
Workload
# Step actions Win10-32bit
1 Basic WWAN Connectivity NA
DETAILS
ATTENTION!! Please follow below information.
1. Please check Error and Warning message in Event Viewer before you start the test case and after you complete the test case, and report it to your team lead, then arrange to open defect, if needed.

2. Perform All Test in Battery Mode (Some of the test items need to perform in AC Mode, follow each Test Case).

3. All Test Activity should be performed with AMT Enabled as Default (applicable on vPro enabled systems).

4. Please check Usability / Cosmetic issues (correct sentence/appropriate display/etc.) and open defect, if needed.

OTHER DETAILS
EUT Quantity : Test system with the supported carrier SIM 1. "Please check Error and Warning message in Event Viewer before you start the test case and after you complete the test case, and report it to your team lead."
2. "Perform All Test in Battery Mode (Some of the test items need to perform in AC Mode, follow each Test Case)"
(All Test Activity should be performed with AMT Enabled)
TEMS Reviewer Log:
Review Logs
Keywords:   None
Requirements :   None
Attached files :

Update History:
This document is not yet modified.