Test Case

Show / Hide direct link   <MAIN> 5849PA: Ether Performance w/ PM Events - PP-81438



Version 1
Created on 25/07/2017 10:37:01  by m_komatsu
Last modified on  28/07/2017 11:58:19  by m_komatsu
Summary

1.  To verify no degradation of Wired LAN Performance w/ AC mode only.

Preconditions
Status:   Review Complete
Priority:   Mandatory
BASIC INFORMATION
Section:S/W Test Require attachment:No
Team:Network Group:Basic Function
Lessons Learned:No Phase:FVT, SVT, Post GA, SIT
Locations:Inhouse: AWS, Inhouse: Cambridge, Compal, Quanta, Wistron Owned By:Eiji Ogata
Objective:Refer to attached Test Procedure
CRITERIA

Refer to attached Test Procedure

EUT QUANTITY

Refer to NWConfig in Test Strategy

EQUIPMENT

1. On board Ether

2. In case, Dock Ether

Critical Attribute:MotherBoard

Ether

BIOS PM

CONFIGURATION

Refer to NWConfig in Test Strategy

REFERENCE PROCEDURE

Refer to attached Test Procedure

STATISTIC INFO
Operating System Win10-32bit Win10-64bit Win7- 64bit Win7- 32bit Total
Test Points
Duration
Workload
# Step actions Win10-32bitWin10-64bitWin7- 64bitWin7- 32bit
1

Packet-Default 32 bytes

AAAA
2

Packet-Max 65500 bytes

AAAA
DETAILS
ATTENTION!! Please follow below information.
1. Please check Error and Warning message in Event Viewer before you start the test case and after you complete the test case, and report it to your team lead, then arrange to open defect, if needed.

2. Perform All Test in Battery Mode (Some of the test items need to perform in AC Mode, follow each Test Case).

3. All Test Activity should be performed with AMT Enabled as Default (applicable on vPro enabled systems).

4. Please check Usability / Cosmetic issues (correct sentence/appropriate display/etc.) and open defect, if needed.

Refer to attached Test Procedure

OTHER DETAILS
TEMS Reviewer Log:
Review Logs
Created last 2017-08-02 03:56:02 by Eiji Ogata. Review Comments(Review Complete): review completed.
Keywords:   None
Requirements :   None
Attached files :
BatchPgm - 00LOOPtestNW32.bat (2451 bytes, application/octet-stream) 28/07/2017
Test Procedure - 5849PA_W10_Ether Performance w PM Events_20170728.xlsx (365087 bytes, application/vnd.openxmlformats-officedocument.spreadsheetml.sheet) 28/07/2017

Update History:
Modified last: 2017-07-28 11:58:19.955953, by Miyuki Komatsu, Uploaded 00LOOPtestNW32.bat
Modified last: 2017-07-28 11:57:27.017404, by Miyuki Komatsu, Uploaded 5849PA_W10_Ether Performance w PM Events_20170728.xlsx
Modified last: 2017-07-28 11:56:29.612592, by Miyuki Komatsu, Initial Release
Modified last: 2017-07-25 18:30:28.868144, by Miyuki Komatsu